Home
                  
Maintenance of steering gear and central connection of frontal loader Zettelmeyer
08/05/09

Description of works:

- disassembling of loader;

- renovation of 10 holes with grinding and welding method;

- replacement of bearings, sealings, hydraulic hoses and pins;

- assembling of loader and handing over to customer.

                            



 
www.diat.lv © 2008