NEWS 
|
|
04/06/23
Inspection of connection surface of Yanmar 6N21 engine block with foundation frame and crankshaft axis...
|
|
05/20/22
Ship`s azipod foundation contact surface milling was performed with portable equipment. Holes for...
|
|
05/20/22
In situ milling of large metal construction was performed. Horizontal and vertical surfaces which...
|
|
05/18/22
Milling of diesel fuel reservoir flange surfaces was performed with portable equipment...
|
|
05/16/22
High accuracy machining of horizontal and vertical slewing ring sitting surfaces was performed with...
|
|
01/25/19
Flange facing of the slewing ring sitting surface (outer Ø 3700 mm) was performed with portable circular mill. Also...
|
|
01/25/19
Measurement of misalignment between main engines CATERPILLAR crankshafts and azimuth thrusters ROLLS...
|
|
01/25/19
According to the project, galvanized steel structures for the construction of an industrial building...
|
|
01/25/19
Rotary mechanism, jaws, traverse and hydraulic cylinders were reconditioned. New knives were produced...
|
|
01/22/19
Reconditioning of slewing ring sitting surface was performed with welding method. The following...
|
|
01/23/18
Design and technical documentation was made for the rear axle of Linde...
|
|
10/21/16
Career hammer crusher THYSSENKRUPP basket was manufactured and installed...
|
|
04/07/16
The portside and starboard propeller shaft axis of the nuclear icebreaker were measured with...
|
|
11/29/15
Portable multifunctional gantry mill was purchased which can perform the following operations for...
|
|
11/26/15
Laser measurement and machining of crane foundation and rimmer (sitting surface for slewing...
|
|
11/26/15
Inspection of connection surface of engine block with foundation frame and crankshaft axis was...
|
|
11/25/15
Replacement of container loader Linde damaged boom part and spreader repair was performed...
|
|
04/27/15
The axis of the rudder device was measured with laser equipment and in accordance to these...
|
|
03/27/15
Machining of cast iron rollers for wooden shavings dryer in situ...
|
|
01/22/15
We participated in the exhibition "Tech Industry 2014" in Riga, where we demonstrated our...
|
|
01/22/15
Rotaty feeder "KREISEL" was reconditioned according to the following job description...
|
|
01/21/15
Various thermal treated sprockets were produced. Diameter up to 1000...
|
|
11/03/14
Loader JCB 3CX was repaired according to the following job description...
|
|
10/24/14
Reconditioning of port crane "Sokol" pin sitting surfaces was performed. The works were...
|
|
10/24/14
Auxiliary engine Wärtsilä Vasa 6R32BC periodical maintenance after 20000 operating hours...
|
|
10/24/14
Grinding of main engine Wärtsilä 6L46 cylinder liner sitting surfaces was performed...
|
|
10/24/14
Fuchs loader broken boom end was replaced by new one...
|
|
10/24/14
Hydraulic cylinders jaws were manufactured according to the drawings...
|
|
10/24/14
A rod for frontal loader was manufactured in set with bronze bushings and pins...
|
|
10/23/14
A shutter was produced from heat-resistant stainless steel...
|
|
10/23/14
New pedestal was produced and a satellite antenna was installed on the top deck of the ferry...
|
|
11/25/13
Inspection of connection surface of engine block with foundation frame and crankshaft axel measurement was...
|
|
07/12/13
Auxiliary engine Wärtsilä 6R32 periodical maintenance after 24000 operating hours was performed...
|
|
03/19/13
Grab holding mechanism rotator gland sitting surfaces were reconditioned with evaporation method...
|
|
02/14/13
Main engine Wärtsilä S.E.M.T.Pielstick PC2.6/V400 cylinder cover gasket seating and exhaust valve body...
|
|
02/12/13
Gear-shaft and bush-shaft was produced for portal crane KONDOR...
|
|
02/12/13
Repair of self-discharging truck load lifting mechanism was performed. Bush and pins sitting surfaces...
|
|
11/22/12
Cogeneration station engine Rolls Royce Bergen KVG-G3 overhaul after 60000 run hours was...
|
|
09/07/12
Grinding of cylinder liner sitting surfaces on the MAN B&W7L42MC engine block was performed with...
|
|
08/10/12
Frontal loader VOLVO L150 rear-axle assembly was overhauled in accordance to the following job description...
|
|
07/27/12
Hardox material knives fpr paper shredder were produced...
|
|
07/27/12
Main engine Wärtsilä-S.E.M.T. Pielstick 12 PC 2,6/2-400 reconditioning of exhaust valve bodies was performed...
|
|
07/16/12
Offshore crane main boom sitting surfaces (Ø350 mm) machining with the following flange facing...
|
|
11/04/11
VALMET M1B710-S250 gearbox bearing sitting surfaces were machined...
|
|
11/03/11
The propeller shaft was measured with laser equipment and according to these measurements...
|
|
11/03/11
Main engine Sulzer ZAL40S engine block was reconditioned by means of machining and further...
|
|
10/28/11
Main engine Wartsila S.E.M.T.Pielstick PC2.6/V400 periodical maintenance after 12500 operating...
|
|
10/25/11
Main engine Wartsila S.E.M.T.Pielstick PC2.6/V400 camshaft straightening was performed...
|
|
10/24/11
In situ bearing sitting surface reconditioning was performed with grinding and welding method...
|
|
07/15/11
Main engine Pielstick 12PC 2,6/2-400 turbocharger BBC VTR 354-11 overhaul was performed...
|
|
07/15/11
In situ reconditioning of trailing suction hopper dredger jet pipe butt-end surface was performed...
|
|
07/15/11
The axis of the rudder device was measured with laser equipment and in accordance to these...
|
|
07/14/11
Support rolls for portal crane "Sokol" were manufactured.
|
|
07/14/11
During the replacement of Main engine B&W 6S50MC-C foundation frame measurements were...
|
|
08/27/10
Overhaul of main engine Wärtsilä low and high temperature cooling water pumps, lube oil pump and...
|
|
08/25/10
According to the order of one of the Latvian ports scoop (lift capacity 9 tons) and quick...
|
|
08/25/10
Auxiliary engine 8VD36/24 bed plate joint flatness and condition of main bearing pockets...
|
|
08/25/10
Steering gear axis was measured with laser equipment and according to these measurement...
|
|
08/25/10
The propeller shaft and main engine crankshaft axis were measured with laser equipment and...
|
|
08/11/10
With laser equipment steering gear axis was measured and further rudder stock bushes...
|
|
08/09/10
Support rolls for portal cranes "Albatros" and "Kondor" were repaired...
|
|
08/09/10
Geometrical dimensions of scrap shredding machine knives were renewed with welding and...
|
|
08/04/10
Bunkering hose reel was designed and produced...
|
|
07/20/10
Periodical maintenance (each 50 000 hours) for engine DEUTZ TBG 616 was performed...
|
|
07/20/10
HARDOX steel knives for mower shredding device were produced...
|
|
07/20/10
6 jaw grab "Polip" was renovated (repair of metal constructions; reconditioning of traverse, jaws and rods...
|
|
02/26/10
Complete overhaul of cylinder heads for DEUTZ engine was carried out...
|
|
02/26/10
Alignment of diesel generator bearings was carried out...
|
|
01/28/10
17,6 cubic metre scoops for loading of bulk cargos were produced...
|
|
01/27/10
Bottom repair of auxiliary boiler SUNROD was performed...
|
|
01/25/10
A demolition mill for car catalizators was manufactured by our own draft...
|
|
09/25/09
Auxiliary engine fuel injectors were reconditioned...
|
|
08/05/09
Maintenance of steering gear and central connection of frontal loader Zettelmeyer...
|
|
08/05/09
Complete retubing of auxiliary boiler KAV - 6,3/16 on board the tanker vessel under DNV class...
|
|
07/24/09
Description of works:...
|
|
04/27/09
Impeller for main engine auxiliary blower was manufactured...
|
|
03/23/09
Line boring of main bearing pockets for auxiliary engine MAN B&W 6S28LH-4 was carried out...
|
|
02/06/09
Four holes were restored in movable part of frame on grader VAMMAS. Ellipse shape was...
|
|
12/11/08
Two-stage stainless steel tube sections were fabricated for vessel coolers...
|
|
12/09/08
Rudder stock sole piece socket shift regarding to the rudder trunk axe was determined with a laser...
|
|
08/22/08
With reference to shipping company order technical documentation and a full set of pipes...
|
|
08/22/08
According to the order of technical management company were fabricated and galvanised different pipes, bolards...
|
|
08/21/08
Our engineers made a desing, technical documentation and scoops for a frontal loader according to the...
|
|
06/10/08
In April our team arrived in Klaipeda to carry out grinding works...
|
|
|